Photovoltaic Power Plant in Svitávka – South Moravian Region
icon Premium
Invest in a secured loan

Photovoltaic Power Plant in Svitávka – South Moravian Region (1st Phase)

marker

Svitávka (Blansko District)

Yield

7.82% p.a.
info

The return represents the amount of money you get for the capital invested. It indicates the difference between the final value of the investment and the capital employed.

p.a. means per annum, i.e. yield calculated on an annual basis.

Example:

You invest CZK 10,000 with a return of 10% p.a. We will pay you the income in a proportional amount every month, you will get a total of CZK 1,000 in income per year.

Loan amount

CZK 67,500,000

Maturity

33 months
info

The maturity date indicates the binding date by which the loan will be repaid and when your investment ends.

After this date, we will send the original invested amount to your account along with the last return.

LTV

11.17%
info

LTV = Loan to Value
(translated as “loan to value”)

LTV indicates the ratio of the property’s value to the loan’s value. The lower the LTV, the higher the collateral.

LTV calculation = loan amount / estimated market price × 100

Get to know the project


This is the first collaboration with the client, who has been engaged in metalworking (precision engineering products) for the past 20 years. Within the group, the client also owns and operates a mountain guesthouse and a commercial warehouse facility intended for lease. The client also owns and operates a photovoltaic power plant in Svitávka (Blansko District) with a capacity of 1,5 MW. The power plant has been in operation since November 2010. It is equipped with tracking panels and was built to a high standard, minimizing the need for panel replacement and repairs. This power plant, together with the receivables arising from the supply of electricity, constitutes the collateral for the loan. The purpose of the financing is the construction of electric vehicle charging stations and an energy storage system for electricity generated by the photovoltaic power plant, using batteries with subsequent supply to the grid during periods of higher purchase prices. Through this solution, the client aims to maximize electricity revenues after the guaranteed feed-in tariff expires. The expected project completion period is approximately nine months. The loan will be drawn in three tranches according to the progress of the project, with the currently drawn tranche amounting to CZK 20,000,000. The loan repayment schedule is structured individually, with principal repayments at six-month intervals. The first principal repayment is due in April 2027, taking into account the expiry of the guaranteed feed-in tariff at the end of the decade.

Description of Real Estate Collateral

01

Photovoltaic power plant Svitávka

Collateral value CZK 179,000,000

arrow
  • Basic description of the collateral: A 1.5 MW photovoltaic power plant located in Svitávka (Blansko District). The power plant has been in operation since November 2010 and is equipped with tracking panels that increase its output. The collateral consists of the power plant technology (panels, inverters, etc.), the land on which the power plant is located (including land with alternative commercial use potential), and receivables from electricity purchasers.
  • Property value as of the valuation date: CZK 179,000,000, dated 7 June 2023.
  • First-ranking mortgage lien
  • Location and surroundings: The industrial area of the market town of Svitávka in the Blansko District represents an attractive location for business thanks to its excellent transport accessibility and strategic location between Blansko and Boskovice.
  • Technical condition of the property: The technical condition of the power plant is very good, with minimal interruptions in electricity supply. It was built to a high standard and is equipped with tracking panels. No deficiencies or defects were identified during the inspection.
tie

INFORMATION ABOUT THE LOAN
AND THE BORROWER

Repayment frequency of principal:
Individually, principal repayments at six-month intervals
Repayment frequency of interest:
Monthly
Repayment ethics:
Seamless (all previous instalments duly paid)
Number of guarantors/co-debtors:
1
Legal form:
Czech company (without negative information)
Amount of the provided loan:
CZK 67,500,000
Volume from the total loan amount offered for participation
CZK 5,500,000
Repayment sources:
Revenue from electricity supplied, metalworking, and rental income
Purpose of utilization:
Construction of an electric vehicle charging station
Numerical designation of the loan
439
home

COLLATERAL
INFORMATION

TOTAL VALUE OF SECURITY
CZK 179,000,000
Total collateral value:
Photovoltaic power plant Svitávka
Location:
Svitávka (Blansko District)
Notarial record:
YES
LTV
Following the drawdown of the remaining loan tranches, the LTV will increase to 37,71%.
kalkulacka CALCULATOR sipka
HOW MUCH DO YOU WANT TO INVEST?
CZK
FOR HOW LONG?
24 months
ON YIELD
9 % p.a.
EXPECTED YIELD
CZK

The calculator calculation is based on a model example of a one-time repayment loan investment (full principal repayment at the end of the loan term). Returns are paid to investors monthly, and the calculator does not consider reinvestment. The actual performance of the investment may differ from the model example. It represents gross yield, subject to taxation. At RONDA INVEST, there are no entry fees or regular fees.